top of page
Image by DAVIDCOHEN

1 - Tub to Shower Conversion

Before & After

733d10_ecd3058b132149648e90b43635d65e6b-mv2-99c71e65-2880w.jpeg
733d10_f98d99d89d0243a1b375393830d1343d-mv2+(1)-2880w.jpeg

Original Estimate Picture

733d10_e3ac1c57b56f4fccbc591882a8c0fe01-mv2-2880w.jpeg

Where the tub spout would have been, there was a diverter to choose your water source.

733d10_ecd3058b132149648e90b43635d65e6b-mv2-99c71e65-2880w.jpeg

The diverter allowed you to choose the shower head or the three Gargoyle heads that were used as the tub fill spouts.

733d10_e00db5e088824fe782b9660a37021184-mv2-297fe513-2880w.jpeg

Upper soffit or dropped ceiling to be removed.

Job in Progress

733d10_18cb1d73886048f9b14f71dc86ddb25e-mv2-25cd924b-2880w.jpeg

Tub and walls removed for plumbing replacement & upgrades.

733d10_b9f6c31c2bee4f749a0feda8bed969a1-mv2-2880w.jpeg

Soffit removed for conventional height shower.

733d10_d06c174873fe4453ae3f454fbd7ee080-mv2-6277a66d-2880w.jpeg

Tile walls and floor completed.

Job Completed

733d10_ef737c7ccd3940ce83460a59f7f9bdbc-mv2-dfe842b1-2880w.jpeg

Final job completed with shower doors installed.

733d10_f98d99d89d0243a1b375393830d1343d-mv2-d99ce691-2880w.jpeg

Final job completed with shower doors installed.

733d10_f98d99d89d0243a1b375393830d1343d-mv2+(1)-2880w.jpeg

Final job completed with shower doors installed.

CALL US AT (904) 522-7331 FOR YOUR FREE ESTIMATE!

bottom of page